Integrated Design II

CPG 499 - Integrated Design II (0-6-2)

continuation of CPG498. Evaluation of various development plans for the hydrocarbon trap utilizing all petroleum engineering tools and skills' Selection of the best plan based on technical and economic feasibility within environmental and legal constrains following the industry's standards and practices. A detailed technical report with presentation.

Pre-requisites: CPG498