Well Completion

PETE 302 - Well Completion (3-0-3)

Subsurface operations needed to prepare the well for production after being drilled and cased. Well completion designs based upon reservoir, mechanical and economic considerations. The production s)stem. Subsurface production control. Completion and work-over fluids. Perforation. remedial cementing, sand control, and well stimulation operations.